05/05/2020 – Contractors will be closing a section of Garnett on Friday, May 8th, at 9 pm to install a water line crossing. The road will reopen on May 9th at 6 am.
Additionally, asphalt placement in the temporary lanes is expected to begin this week, use caution and expect delays
![](https://i0.wp.com/www.owassoisms.com/wp-content/uploads/2020/05/Garnett_1-1.jpg?resize=600%2C367)