Spread the love

 

 

from:  CityofOwasso.com

The City of Owasso’s Recreation and Culture Department is proud to announce that construction of the new 5K Heart Healthy Trail is underway! 

The 5K Heart Healthy is scheduled to be completed sometime in February. HHT updated 10.25.21

20211207_084830

20211207_084823

20211202_075044

20211201_114838

The 5K Heart Healthy Trail will be located at the southwest portion of the South Sports Park off of 106th street. 

• Asphalt Surface 

• 6 Foot Wide 

• 1 Lap = 1.03 Miles / 1.66 Kilometer

• 3 Laps = 3.1 Miles / 5 Kilometer