from: CityofOwasso.com
The City of Owasso’s Recreation and Culture Department is proud to announce that construction of the new 5K Heart Healthy Trail is underway!
The 5K Heart Healthy is scheduled to be completed sometime in February.
The 5K Heart Healthy Trail will be located at the southwest portion of the South Sports Park off of 106th street.
• Asphalt Surface
• 6 Foot Wide
• 1 Lap = 1.03 Miles / 1.66 Kilometer
• 3 Laps = 3.1 Miles / 5 Kilometer